Back to news
12 Jan. 2022

Renovation of the headquarters of Bausparkasse Schwäbisch Hall

Share on
The expansion has started: Bausparkasse Schwäbisch Hall is gradually renovating its head office in Schwäbisch Hall, Baden-Württemberg. In the first stage, two buildings of the extensive building stock will be refurbished. Now the finalized 3D overall planning of all specialist trades is going into execution. OBERMEYER was commissioned with the overall planning for these refurbishments.

The existing buildings are in the same technical and office design condition as the last major site optimization project from 1995. The new building strategy provides for sustainable, energy-efficient, structural and technical modernization. Modern working environments will be created.


New offices on a redevelopment area of 8000 m²
The first stage comprises the refurbishment of the technical equipment and the interior fittings of office buildings G and H, which were commissioned in 1983. The refurbishment area here covers around 8000 m².

In total, new office space for around 600 employees will be created on four floors in Building H, which will be designed according to the requirements of “activity-based working”. The project also includes renovation of the roofs. At the same time, a photovoltaic system will be installed and an exterior, open escape stairwell will be newly built.

The deconstruction measures include the entire interior work and thus the gutting down to the shell in the office areas, which will be carried out floor by floor from top to bottom.


3D model for collaboration across locations
OBERMEYER Gebäudeplanung was commissioned with the general planning, the basic evaluation, the preliminary, draft, approval and execution planning, the awarding of contracts, the construction supervision, the deconstruction planning as well as with the remediation of the building pollutants. OBERMEYER Gebäudeplanung was commissioned with the general planning, the basic evaluation, the preliminary, draft, approval and execution planning, the awarding of contracts, the construction supervision, the deconstruction planning as well as with the remediation of the building pollutants.

Thanks to a 3D master model, the cooperation is cross-location: The Karlsruhe and Wiesbaden sites are responsible for the architectural planning, while the TGA planning is provided from Munich. Project manager Claus Wannenmacher: “Team spirit was always atthis exciting project’s forefront. More than 120 colleagues from OBERMEYER are involved and are doing an excellent job throughout. This project gives us a lot of pleasure!”


Refurbishment without interrupting operation of the technical systems
Construction in existing buildings is the supreme discipline: The major challenge of the project is to refurbish the technical systems in the basement and the print shop on the first floor without interrupting operations.

Quality assurance is carried out permanently in all phases and areas. In addition, all 3,400 Schwäbisch Hall employees at the site are called upon to evaluate OBERMEYER’s performance during and after construction work.


About OBERMEYER:
The OBERMEYER Group is one of the largest independent German planning companies and has been an expert in overall planning and qualified specialist planning for more than 60 years.

With over 1,400 employees worldwide, OBERMEYER provides planning services in the fields of buildings, infrastructure and building services engineering. Together with the scientific research institutes, almost all specialist fields of engineering and construction planning are covered.

Inspired by the innovation spirit of its founder Leonhard Obermeyer, the company creates intelligent, forward-looking solutions using the latest digital tools and agile methods.


Images:
We provide the photographic material exclusively for publication in the context of this press release. Please indicate “OBERMEYER” as image source when publishing.


Specimen copies:
Please send us two specimen copies. For online publications, please send the corresponding link to presse@obermeyer-group.com. Thank you very much!
Other News
12 Feb. 2025
OBERMEYER Middle East has been awarded as Best Engineering Consultancy Company 2024
READ ARTICLE
12 Jun. 2023
OBERMEYER Middle East GmbH: Exclusive interview with Spiro Murr in UAE Times
READ ARTICLE
10 Nov. 2023
New Head of Operations Abu Dhabi
READ ARTICLE
30 Apr. 2024
Start of construction for Semerínka residential project in Prague: OBERMEYER HELIKA hands over finalised documentation
READ ARTICLE
09 Apr. 2024
OBERMEYER Infrastructure supported CASUA in the architectural competition for a railway terminal in the Czech Republic
READ ARTICLE
30 Oct. 2023
Expansion of the business field project management: OBERMEYER with new branch office in Wiesbaden
READ ARTICLE
17 Mar. 2023
Brenner north-approach: OBERMEYER plans section Grafing-Ostermünchen
READ ARTICLE
13 Apr. 2023
OBERMEYER shareholder manages company succession
READ ARTICLE
07 Nov. 2022
Würth opens Innovation Center
READ ARTICLE
07 Apr. 2022
New Director of OBERMEYER Infrastruktur
READ ARTICLE